Technical document

The segmented principle of multistage injection molding

2023-01-02 15:49:57 hooren

1. Flow characteristics of plastic melt

Screw propulsion phase

First paragraph (starting paragraph)

Generally starting from injection molding, this section is mainly to enable the plastic melt to stably enter the main channel of the mold from the cylinder. Its injection speed is usually slow, mainly to prevent the melt from sputtering at high speeds, resulting in air involvement. For example, for some high-viscosity engineering plastics such as PC (polycarbonate), the starting speed can be set at 10-30% of the maximum injection speed.

Intermediate section

When the melt enters the main stream smoothly, the injection speed is adjusted according to the complexity of the mold cavity and the wall thickness distribution. For simple products with uniform wall thickness, this section can be filled at a relatively high and stable speed to improve production efficiency. For example, for thin-walled simple containers made of PP (polypropylene), the injection speed can be set to a maximum injection speed of 60-80%.

For complex products with wall thickness differences, the speed should be appropriately accelerated in the thin-wall part to ensure that the melt can be quickly filled to prevent short shots. In the thick wall part, the speed should be slowed down properly to avoid defects such as trapped gas and flash. For example, when plastic products with reinforcing bars are injected, the speed can be accelerated at the filling of reinforcing bars (the thin-walled part), while the speed in the thick-walled part of the main body is slowed down accordingly.

Last section

The speed of this section should be gradually reduced so that the melt can smoothly transition to the pressure holding stage. The main purpose is to avoid defects due to sudden pressure changes at the moment of pressure retention switching. The rate of speed reduction should be determined according to the characteristics of the plastic and the requirements of the product, and the speed is generally reduced to the maximum injection speed of 10-30%.

injection mould

Pressure holding stage

Hold the pressure first section

At the beginning of the pressure holding, the pressure is relatively high, mainly to compensate for the volume shrinkage of the plastic during the cooling process. For crystalline plastics (such as PA-6 polyamide 6), due to its crystallization process will lead to large volume shrinkage, the pressure of the first stage is usually higher, and can be set to 70-90% of the maximum injection pressure to ensure the dimensional accuracy of the product.

Hold the middle section and the last section

As the plastic is further cooled, the holding pressure can be gradually reduced. The middle section pressure can be reduced to 40-60% of the maximum injection pressure, and the final section can be reduced to 10-30%. This can ensure the quality of the product at the same time, reduce the residual stress, prevent the product after the release of warping deformation and other problems. At the same time, the length of the pressure holding time should also be determined according to the wall thickness of the product and the thermal properties of the plastic, the general pressure holding time of thick wall products is longer, and the pressure holding time of thin wall products is shorter.

Second, product structure characteristics

Wall thickness difference

For products with uneven wall thickness, they should be segmented according to the wall thickness distribution. In the thin-walled part, the fast injection speed is used to ensure that the melt can be filled quickly, and to prevent the situation that excessive cooling leads to the increase of melt viscosity and cannot be filled. For example, when injection molding an electronic case with thin-wall and thick-wall connections, the injection speed of the thin-wall part can be 1.5-2 times that of the thick-wall part. In the thick wall part, it is necessary to slow down the speed to avoid trapped gas and contraction marks.

Structural complexity

For products with complex structure, such as products with side holes, backsnaps, reinforcing bars and other structures. When filling parts close to these complex structures, the injection speed and pressure should be adjusted appropriately. For example, when filling the area near the side hole, slow down to prevent the melt from breaking through the hole wall; When filling the reinforcement part, the pressure can be appropriately increased to ensure that the reinforcement can be completely filled.

Appearance requirement

If the product has high requirements for appearance quality, such as no flow marks and no weld marks on the surface. In the filling stage of the surface, to control the injection speed and pressure, relatively low speed and appropriate pressure are generally used to obtain good surface quality. For example, for products with strict appearance requirements such as automotive interior parts, the injection speed of the surface filling stage can be set to a maximum injection speed of 30-50%, while matching the appropriate mold temperature to reduce surface defects.

injection mould

Home
Product
News
Contact
亚洲成A∨人片在线观看无码| 精品在线一区二区在线观看| 91蜜桃国产成人精品区在线| 国产亚洲日本精品一区| 亚洲AV日韩AV无码另类小说久| 一区二区三区黄色视频| 五年沉淀只做精品的网址| 亚洲午夜精品久久久久久浪潮| 亚洲日本成本人观看| 亚洲免费福利精品日韩视频| 特级丰满少妇一级AAAA爱毛片| 亚洲无毛系列_国产精品视频综合区| 亚洲AV永久无码精品三区在线| 国产 丝袜 在线 亚洲 日韩| 欧美一性一乱一交一视频| 无毒不卡在线观看无需| AV片在线观看免费| 另类亚洲小说图片综合区| 国产精品污www一区二区三区乱伦| 2021国产麻豆剧果冻传媒入口| 精品久久久久久久人妻九色欲av| 天天视频一区二区三区| 日产一级二级片无码免费在线看| 欧洲无码一区二区三区在线观看| 国产成人精品久久二区二区| 国产精品午夜爆乳美女视频免费| 少妇私密擦油喷水高潮爽| 国内精品一区二区视频在线| 人人妻人人添人人爽日韩欧美| 无码人妻精品一区二区三区9厂| 久久综合中文字幕一区二区三区| 国内原创免费自拍视频网址| 精品欧美一区二区三区在线观看| 久久久无码精品亚洲日韩按摩| 粗大黑人巨精大战欧美成人| 中文精品无码中文字幕无码专区| 肉大捧一进一出免费视频| 国产无遮挡色视频在线观看| 国产精品无码av在线播放| 水蜜桃国产在线观看免费视频| 亚洲AV成人无码久久精品|